GE Frame 6 Gas Turbine Power plant, 35MW / 50Hz

Zero Hours / Refurbished with Warranty 

(Ref 1205)


35MW GE Frame 6 Gas Turbine Power plant package

  • 2x units available, current order delivery scheduled 1st Qtr 2014
  • Can be supplied either 50Hz or 60Hz converted
  • Completely Refurbished and zero houred 
  • Complete with Warranty
  • Technical Scope and Balance of Plant specs to be defined at order placement 

Removal, Re-installation and Worldwide Shipping options:

Gengear associate company Genco Energy can also provide clients where required, a full "in house" Project & Construction Management service.

This includes pre-feasibility, disassembly, shipping, relocation, project construction management and commissioning service for this equipment to meet customers specific requirements

Click on both Project & Construction Management and Shipping links for further information.


Equipment Summary:

Click on thumbnails to view Gallery:

  • Gas Turbine Power plant
  • Generator open ventilated brushless excitation
  • Air inlet vents
  • Exhaust vents
  • Cooling system
  • Fire detection and suppression equipment

Operational Performance

  • 35MW Output, 11kV

Images may take a few seconds to load

Contact for more information:

Gengear Limited   Email: enquiries@gengear.co.nz     Phone: +64 9 425 9331 
Please quote Listing ref 1205


Disclaimer:

Power Generation equipment is listed for sale herein on consignment basis unless otherwise specifically stated.
Whilst Gengear Limited makes every effort with vendors to ensure details & specifications stated are factual and accurate, the information is current only to the date the listing was posted and as such these details can quickly become out of date.

Unless specifically stated Gengear Limited gives no warranty to either accuracy of information provided, mechanical condition of the power plant or compliance with the relevant country energy safety authority. All specifications and representations are subject to buyer verification prior to committing to purchase.

Gengear Limited recommends all prospective purchasers engage their own independent technical inspection of the power plant and relevant documents prior to committing to purchase.
All listing representations are subject to change without notice.

E & OE
Gengear Limited